Introduction:
With hot air and cool air, it is used for check samples during the sample color adjusting process. When connected to steam air from the bents will dry the sample in several minutes.
Feature:
1. There are three vents including two hot air vents and one cool air vent.
2. There is a controller which can adjust the air-blowing rate.
ADD:Room 2317, Zhongxin Building, No.268, Baogang Avenue, Guangzhou, China
TEL : 0086-20-34229974
E-Mail: eric@gzrunhao.net